Completed Projects

Erection, Installation, Testing, Commissioning

  • 220/132 KV System | AIS, Indoor
  • 90/120 MVA Transformers
  • Circuit Breakers 3 Sets | CT, PT 27 Nos
  • Oil Filtration | BDV Test report
  • Isolators | Surge Arrestor | Lightening Arrestors
  • Panels | Control, Automation, Relay, SCADA
  • FOTE | 10 Set & 17 Nos
  • PCC | MCC | AC DB | DC DB
  • Structural Material for Fasteners
  • Gantry LM Equipment | 80 MT
  • Busbar 4” IPS Al Tube 220 Meter
  • ASCRA Zebra Conductor 1300 Meter
  • Earthing System |8 KM of cable and Strips |55 Pits
  • Industrial Lighting
  • Battery Chargers, Banks, UPS|110 V & 48 V | 2 Nos
  • Power Cables laying with trays, termination |6 KM
  • Control Cable laying with trays, termination26 KM
  • EHT Project Licensee from ELBO
  • Drawing approval from Electrical Inspector's office

Erection, Installation, Testing, Commissioning

  • 220/132 KV Switchyard
  • 132 KV MRS Extension
  • SF6 Circuit breaker , CT, PT, Isolators | 60 Nos
  • 198, 120 KV Lightening & Surge Arrestor| 22 Nos
  • 6.6/0 .415 KV, 630 KVA Auxiliary transformer
  • Oil Filtration and BDV report
  • Control and Relay Panel | 20 Nos
  • 415 V AC DB, UPS
  • Busbar 4” IPS Al Tube 500 Meter
  • ASCR Moose Conductor 1200 Meter
  • Augmentation of Existing Bus bar system
  • Substation Automation System
  • Power Cable Laying ,Trays, Termination |7 KM
  • Control Cable Laying, Trays, Termination| 33 KM
  • Laying of Cable Tray 2 KM
  • Fabrication work |50 MT
  • Earthing System |1 KM of Cable and Strips
  • Obtain Project License
  • Charging Clearance

Erection, Installation, Testing, Commissioning

  • Transformers with OLTC | Erection
  • Oil Filtration | BDV Test report
  • Power Transformer 33/6.9 KV| 25 /31.5 MVA |6 Nos
  • Isolation Transformer 33/33 KV | 5 MVA | 2 Nos
  • Distribution Transformer 6.6/0.433 KV System | 2 MVA | 142 Nos
  • Distribution Transformer 6.6/0.690 KV System | 3.5 MVA | 2 Nos
  • Lighting Transformers 415 V, 250 KVA, 100 KVA | 14 Nos
  • NGR, 4 Nos | Switch Boards HT 2000 A , 4 Nos | LT 2000 A , 20 Nos
  • 33, 6.6 KV Breaker |Isolators | Surge & Lightening Arrestors | 4 Lots
  • HV Bus duct, 3200 A, 160 Meter | LV Bus duct, 3200 A, 270 Meter
  • PCC | MCC | MLDB | AC DB | DC DB | 50 Lot
  • Earthing System | 15 Km cable and strips |150 Pits
  • HV and LV Control Cables |Laying |Termination |130 KM
  • VFD Verticals |7.5 Kw to 800 KW |110 Nos
  • 250 Receptacles | 30 Fans | 1700 Luminaires | 120 Boxes
  • Battery and Battery Chargers | 4 Nos
  • UPS, 50 KVA, 220 V | 4 Nos
  • HVAC System, AHU, Ducts |10 Panels

Erection, Installation, Testing, Commissioning

  • 400 KV Outdoor GIS | SF6 Gas Insulated Switchgear
  • Bays for Out Going Feeder, Generator Transformer, Station Transformer, Bus Coupler, Bus Section, Bus PT |All Panels and accessories | 5 Lots
  • Surge Arrestor | 198, 390 KV | 18 Set
  • Current Transformer 220 KV Oil Filled |6 Nos
  • Lighting Transformer Dry Type CRT | 2 Set
  • Laying of Power Cable with trays, termination |9 KM
  • Laying Of Control Cables with trays, termination| 26 KM
  • Structural Material for Pipe and Lattice Structure | 33 MT
  • Earthing System | 4 KM of cable and strips| 75 Pits
  • Bus Post Insulator 420 KV | 12 set
  • Illumination in Maintenance, Control room
  • Fire retardant painting
  • PDB with switchgears | 415, 240 , 220 V DC, UPS DB| 6 Set
  • Busbar 4” IPS Al Tube | 560 Meters
  • Project license, drawing approval, CEI inspection and charging clearance

Supervisors and Labor

  • Cable laying, dressing HV, LV, Power, Control
  • Cable tray, Raceway, Risers, Glanding, Termination, Ferruling.
  • Installation of Junction Boxes, LDB
  • Installation of GI pipes, Angel, GI bend, PVC Pipes
  • Fixing of Switches, Sockets, Celling Light, Light Fitting
  • Maintain site house keeping
  • Setup the scaffolding
  • Fire Proof Sealing work
  • Loading & Unloading

Erection, Installation, Testing, Commissioning

  • 33 KV RMU, 17,5 MVA Transformer, HT Panel | 2 Sets
  • Indoor Type Distribution Transformer | 4 Set
  • Oil Filtration and BDV test report
  • Battery Charger and bank | 1 Set
  • 11 KV HT Panels, VCB
  • Distribution Transformer Indoor type
  • Indoor Bus duct, Horizontal and Vertical bend, flexible termination
  • MCCB 50 Nos, MCB, DB
  • LT Panels, Lighting, MDB, MCC, PDB, UPS DB | 250 Sets
  • 500 KVAR APFC Panels |8 set
  • Cable laying of Power and Control Cables | 50 KM
  • Industrial Lighting
  • Excavation of Cable Trench
  • Cable Trays
  • Earthing System | Strip | Pits

Erection, Installation, Testing, Commissioning

  • 33/ 6.6 KV System | AIS, Indoor
  • 15/20 MVA Transformers 2 Nos| Circuit Breakers | CT, PT
  • Oil Filtration | BDV Test report
  • Switch board |33 KV 1250 A 11 Nos | 6.6 KV 2000 A 23 Nos
  • Isolators | Surge Arrestor | Lightening Arrestors
  • Automation | Relay | SCADA, | Control | FOTE | Synchronization | Metering | MLDB |ACDB | DCDB|35 Nos
  • Earthing System | 1 KM wire and strips | 30 Pits Industrial Lighting | Flame Proof | 75 Nos
  • Battery Chargers, Banks, UPS| 220 V & 48 V | 2 Set
  • Cable laying of 33 KV and 6.6 KV | 5 KM
  • Cable laying of LV Power and Control Cables| 8 KM
  • Fire Detection and Alarm System
  • Ventilation and Exhaust System
  • Drawing approval from statuary boards

Erection, Installation, Testing, Commissioning

  • 6.6 KV System | AIS, Indoor
  • 6 /0.433 KV 2 MVA Dry Type Transformers with Cu Bus duct | 3 Nos
  • 6.6 KV Switchboard | Bus coupler | 2 I/C | 6 O/G feeders | Busbar
  • 415 V PCC with 32 ACB 2 Nos
  • 6.6 KV Cable Laying, Termination, Jointing , Marking| 1 KM
  • LV Power and Control Cables Laying, Termination | 1.5 KM
  • Earthing System | 0.450 KM wire and strips | 12 Pits
  • Structural Steel | 4 Ton
  • 6.6kV & 1.1kV Grade Rubber Mat | 32 Metre
  • Display of Sign Boads | 18 Nos
  • Battery Chargers, Banks, UPS| 25 AH, 110 V | 2 Set
  • Fire and Water Proof Sealing
  • 50 KVA, 415 V Lighting Transformer
  • High bay Luminaries, Lighting JB, laying of cu cables, Tube light
  • Industrial type Welding Receptacles, Exhaust Fans

Supply, Installation, Testing, Commissioning

  • 11 KV Switch Yard
  • 415 V PCC with 400A MCCB 1 Nos
  • 11 KV Cable Laying, Termination, Jointing, Marking| 200 Mtrs
  • Earthing System | 0.4 KM wire and strips | 57 Pits
  • Lighting Arrestor | 9 KV | 5KA
  • Structural Steel | 3 Ton
  • GI Fencing | 55 Mtrs
  • Display of Sign Boards | 20 Nos
  • 500 KVA/200 KVA, 415 V Transformer
  • Street Lights